From 500kV transmission tower erection to substation commissioning and distribution system upgrades, Hyojeong Power3 Construction Corp. has delivered safe, reliable, and high-quality power infrastructure for government agencies, utilities, and private clients since 2023.
We work with trusted local and international partners to deliver every project.
Hyojeong Power3 Construction Corp. carried out SF6 gas handling, analysis, and grounding system integrity testing in Limay, Bataan. This was followed by SF6 gas leakage testing of 230kV GIS circuit breakers and the bus system at the SMC Power Plant in Mariveles, Bataan.
SF6 gas handling and analysis, grounding system integrity test, leakage testing of 230kV GIS circuit breakers, and bus system inspection — requiring strict safety protocols and specialized testing equipment to ensure the integrity of high-voltage gas-insulated switchgear.
Replacement of 230kV circuit breakers (GIS type) at two NGCP substations — San Rafael, Bulacan and Olongapo, Zambales. The project also included secondary electrical works covering controls, protections, metering, alarms, and interlocking circuits at both substation sites.
Full replacement of GIS-type circuit breakers, followed by comprehensive secondary works including wiring of control and protection panels, metering systems, alarm circuits, and interlocking logic — all completed in compliance with NGCP standards and energized-system safety requirements.
This multi-phase project for LUECO (Luz de Pampanga Electric Cooperative) involved reconductoring and revamping approximately 5.0 km of the existing 69kV transmission line — upgrading conductors from 2/0 AWG Cu to 336.4MCM TACSR across 50 structures. Phase 3 followed with installation and conductor stringing for an additional 7.4 km covering 113 structures.
Full reconductoring works, tower structure assessment and upgrades, conductor stringing and tensioning, infrared scanning of junctions and dead ends upon energization, and a separate 2.5km 13.2kV transmission line conductor stringing project under the same client.
One of our most significant projects to date: erection of Tower CD-43 for the NGCP/MDC 500kV transmission line in Barangay Pangil, Amadeo, Cavite, completed on 12 September 2025. This was accompanied by concrete foundation construction for Tower 82 in Cabangan, Zambales, and full sagging and clipping works in Gapan, Nueva Ecija.
Heavy civil works including tower foundation excavation and concrete pouring, structural steel tower assembly and erection, full sagging and clipping of 500kV conductors — all executed under strict NGCP/MDC safety and quality standards in challenging field conditions across multiple provinces.
From 500kV transmission tower erection and substation construction to distribution line upgrades and renewable energy systems we deliver expert electrical works that ensure safety, efficiency, and long-term performance across the Philippines.