Welcome to our services
At Hyojeong Power3 Construction Corp., we provide complete and dependable solutions for electrical power infrastructure, from high-voltage transmission lines and substation construction to distribution systems, renewable energy integration, and power equipment testing. Our goal is to deliver safe, efficient, and long-lasting results for industrial facilities, commercial establishments, government agencies, and growing communities across the Philippines.
INQUIRE NOW
Projects Built With
Integrity & Compliance
At Hyojeong Power3 Construction Corp., every project follows strict coordination, documentation, and full compliance with Philippine electrical and safety standards. We hold all required government licenses including our PCAB Regular Contractor's License (Specialty-Electrical Work, Category E), SEC Certificate of Incorporation, Mayor's Permit, BIR registration, and SSS registration. We work only with the required permits, LGU approvals, and utility clearances to ensure that all installations — whether transmission towers, substations, or distribution lines — are safe, legal, and fully certified.
Some services we do
Transmission Line Construction
Description:
Construction of high-voltage overhead transmission lines including 500kV, 230kV, and 69kV systems. We handle steel tower and monopole erection, conductor stringing, full sagging and clipping, and all associated civil foundation works.
Typical Timeline: Varies by project scope and line length
Best For:
NGCP projects, power utilities, renewable energy developers, government infrastructure programs
Substation Construction & Commissioning
Description:
Full design, installation, testing, and commissioning of substations and power equipment — including transformers, circuit breakers (including GIS type), switchgears, protection panels, metering panels, and automation systems (ATS, BMS, SCADA).
Typical Timeline: Varies by substation capacity and scope
Best For:
Industrial parks, power utilities, government facilities, renewable energy projects
Distribution Line & Power Pole Works
Description:
Construction of overhead electrical distribution lines including conductor installation, cross-arm and insulator assembly, power pole erection, switchgear installation, and cable tensioning. Also covers transformer installation, commissioning, repair, and maintenance.
Typical Timeline: 1–7 days depending on scope and distance
Best For:
Industrial zones, subdivisions, LGUs, commercial facilities, barangay electrification projects
How To Work With Us
Step 1
Submit a Project Inquiry
Start by filling out our inquiry form to tell us about your electrical or power infrastructure needs.
This allows our team to understand your project requirements, location, and timeline.
Step 2
Site Assessment & Proposal
Our engineers conduct a site assessment and prepare a detailed proposal.
Outlining the scope of work, technical specifications, cost estimate, and project schedule for your approval.
Step 3
Project Execution & Completion
Once approved, our team proceeds with planning, mobilization, and execution.
Ensuring safe, efficient, and high-quality electrical works until project completion and commissioning.
Service Areas Across the Philippines
We have completed projects in Pampanga, Bulacan, Bataan, Zambales, Cavite, Nueva Ecija, and other provinces. Contact us today to request a quote or schedule an assessment.
INQUIRE NOW